The Plan

From source to sea, in three phases

Chennai Blue Vision 2030 isn't one big-bang project. It's a sequence — each phase proving itself before the next begins, and each stretch of river paying part of its own way.

Section summary: This page is the three-phase roadmap to restore the Cooum from source to sea. The aim is cleaner water, healthier banks, and public access, funded in partnership rather than as a single city expense.

Roadmap

Three phases, mapped downstream

This is our proposed sequencing as a foundation, not an official government timeline — it's the order we'd argue for, and the order we're organising volunteers and partners around.

PHASE 1 · KM 0–24 · FOUNDATION

Stop the damage

Close the remaining untreated sewage inlets, restart consistent desilting, and get solid-waste collection working at the points where the river is dumped on most. Nothing downstream matters until this stretch holds.

PHASE 2 · KM 24–54 · GREEN CORRIDOR

Rebuild the banks

Replace bare, dumped-on embankments with planted buffers, stepped stone banks and a continuous walking path — the green corridor shown in our concept visuals, built stretch by stretch as funding from Phase 1's results comes in.

PHASE 3 · KM 54–72 · OPEN WATERFRONT

Open it to the city

Boat access, riverfront squares and controlled development along the reclaimed banks — the phase that turns restoration into an amenity Chennai actively uses, and that generates the value to sustain the whole project.

Beyond the main channel

A 25-lake network feeds the basin

The Cooum doesn't recover on its own — it's fed by a wider network of lakes and tanks across the basin. Reviving the river means reviving them too, in step with the state's own Cooum River Revival vision.

25 LAKES · INTERCONNECTED & RESTORED
Retteri Lake Puzhal Lake Kolavai Lake Chembarambakkam Lake Perungalathur Lake +21 more across the basin

Restoring flow between these waterbodies improves flood buffering, recharges groundwater and feeds the Cooum a cleaner, steadier channel from source to sea.

WATER QUALITY

15 STP facilities

Sewage treatment plants sized to bring the basin toward 100% treated discharge — closing the untreated inlets that keep the river a drain instead of a river.

GREEN CORRIDOR

5,000+ trees planted

Bio-shore planting stabilises banks naturally, cuts erosion, and rebuilds the tree canopy the corridor lost over decades of encroachment.

COMMUNITY

5,000+ eco-volunteers

Citizen monitoring keeps every restored stretch accountable — residents watching their own patch of river, lake or canal.

The funding model

Zero cost. Maximum benefit.

Let the river's own value fund its restoration

Most Cooum restoration proposals have stalled the same way: a large public budget request, competing against every other city priority, for a project whose benefits take years to show. We think that's the wrong ask.

Instead, Chennai Blue Vision 2030 leans on the value a cleaner riverfront creates directly:

LAND VALUE

Riverfront land uplift

Restored embankments raise the value of adjoining land. A share of that uplift, through partnership agreements, funds the next stretch.

TOURISM & RECREATION

A river people use

Boat rides, promenades and riverside events generate ongoing revenue that keeps the corridor maintained, rather than relying on repeat public spending.

PUBLIC HEALTH

Costs avoided, not just spent

Less flooding, less disease burden from open sewage, and less spent managing the consequences of a polluted river running through the city.

Concept visualization of a landscaped Cooum riverside promenade